I doubt they would keep releasing the test match information if it’s noy going to be ready.
I think it’ll be ready but not completed. Fit example the outside cladding isn’t a essential part to get it ready for use so that’s something that can be done after
Yea maybe, that's not a bad point. But still worries me they need to recruit more people in a mad rush this close to supposed completion date. Surely if it was just the cladding etc then this mad rush wouldn't be happening?
comment by Bake 'em away toys (U7303)
posted 11 seconds ago
Yea maybe, that's not a bad point. But still worries me they need to recruit more people in a mad rush this close to supposed completion date. Surely if it was just the cladding etc then this mad rush wouldn't be happening?
----------------------------------------------------------------------
I’m not say it’s just the cladding I’m saying things like that don’t have to be completed for us to play there meaning more people will be put on the more urgent parts.
It’ll be ready for Liverpool but not fully completed is my view.
Tbf the timeline was crazy. To built 3/4 of a very complex stadium in 12 months is astonishing.
Went passed it the other day and it doesn't take an engineer to see how unfinished it looks. I thought how the hell are we going to get this ready in a months time or so. Half the stadium looks missing.
The amount of money being chucked at it to complete it is ridiculous as well.
With hindsight it probably would have made more sense to knock down the hole of the family stand for the 16/17 season so we could start building it quicker.
Surely if it was on track then they would have resourced staff accordingly. The fact they are now pretty desperate to get people in shows it's not on track.
Maybe I am over doing it, but I am a little worried.
comment by Edinspur (U1109)
posted 16 seconds ago
The amount of money being chucked at it to complete it is ridiculous as well.
With hindsight it probably would have made more sense to knock down the hole of the family stand for the 16/17 season so we could start building it quicker.
----------------------------------------------------------------------
The money chucked at it is a concern but part of me does wonder whether the club has to foot all the bill if the construction company are behind. Perhaps they are paying at least towards some of these costs if thrybah3v committed to a completion date.
I know some and read other people that have worked there that the turnaround on staff is quick because they are working so hard they do a month or so take the money and quit
comment by Bake 'em away toys (U7303)
posted 1 minute ago
comment by Edinspur (U1109)
posted 16 seconds ago
The amount of money being chucked at it to complete it is ridiculous as well.
With hindsight it probably would have made more sense to knock down the hole of the family stand for the 16/17 season so we could start building it quicker.
----------------------------------------------------------------------
The money chucked at it is a concern but part of me does wonder whether the club has to foot all the bill if the construction company are behind. Perhaps they are paying at least towards some of these costs if thrybah3v committed to a completion date.
----------------------------------------------------------------------
Depends how the contract is I guess. If the subcontractor have taken all the responsibility then we probably won't be as hit financially, however if we decided to build it in-house and a variety of different subbies then we are probs more screeeewed.
If mace don’t hit the deadlines apparently they get hit with massive financial penalties
comment by MKspur - Unleash the Grealish (U9129)
posted 33 seconds ago
If mace don’t hit the deadlines apparently they get hit with massive financial penalties
----------------------------------------------------------------------
I work in Procurement and look after statement of works/contracts all the time with 3rd parties. I'm pretty sure they would have had a fixed outcome contract linked to a completion dates of different phases, if these dates are not met then financial penalty clauses are put in place.
yeah just looking at it you can see in won't be complete but hopefully it will be ready for the match.
Won't look great unveiling an incomplete stadium
We are still a month away from the first public test event and much can get done in this time when in the final stages.
Anything between now and then is just pure speculation unless officially from club.
A job that is seriously behind schedule is a lot different to the whole thing being seriously behind schedule.
I would hazard a guess that this particular job may have something to do with the skywalk because that appears to be the only thing to me construction wise and high up that does not seem to have progressed.
Not sure it's a critical feature that needs to be completed in the next several weeks but perhaps there is urgency to have it done and dusted by the NFL game.
Reckon it’ll be ready for the Liverpool game, but certainly not finished. As long as any unfinished building work passed health and safety then it’ll be fine. They can bang out the work relentlessly during international breaks and depending on how the CL and league cup fixtures fall, might get an extended time period there to work on finishing it.
Apparently the bars are only going to be ready to serve cream soda for the first six months, until all the pumps are sorted out.
comment by sandy (U20567)
posted 1 minute ago
Apparently the bars are only going to be ready to serve cream soda for the first six months, until all the pumps are sorted out.
----------------------------------------------------------------------
Woohoo
got to be finished to get practical completion and be signed off by local authority
It will be ready by Liverpool
The test events I’m not so sure
comment by Dave&Danny (U4428)
posted 1 minute ago
got to be finished to get practical completion and be signed off by local authority
----------------------------------------------------------------------
That would be structural and health and safety signs etc a skirting board that needs a second will be fine 😀
Lardy dardy we likes to party we dont cause trouble and we dont bother nobody.
Sign in if you want to comment
Stadium Update
Page 1 of 2
posted on 26/7/18
I doubt they would keep releasing the test match information if it’s noy going to be ready.
I think it’ll be ready but not completed. Fit example the outside cladding isn’t a essential part to get it ready for use so that’s something that can be done after
posted on 26/7/18
Yea maybe, that's not a bad point. But still worries me they need to recruit more people in a mad rush this close to supposed completion date. Surely if it was just the cladding etc then this mad rush wouldn't be happening?
posted on 26/7/18
comment by Bake 'em away toys (U7303)
posted 11 seconds ago
Yea maybe, that's not a bad point. But still worries me they need to recruit more people in a mad rush this close to supposed completion date. Surely if it was just the cladding etc then this mad rush wouldn't be happening?
----------------------------------------------------------------------
I’m not say it’s just the cladding I’m saying things like that don’t have to be completed for us to play there meaning more people will be put on the more urgent parts.
It’ll be ready for Liverpool but not fully completed is my view.
Tbf the timeline was crazy. To built 3/4 of a very complex stadium in 12 months is astonishing.
posted on 26/7/18
Went passed it the other day and it doesn't take an engineer to see how unfinished it looks. I thought how the hell are we going to get this ready in a months time or so. Half the stadium looks missing.
posted on 26/7/18
The amount of money being chucked at it to complete it is ridiculous as well.
With hindsight it probably would have made more sense to knock down the hole of the family stand for the 16/17 season so we could start building it quicker.
posted on 26/7/18
Surely if it was on track then they would have resourced staff accordingly. The fact they are now pretty desperate to get people in shows it's not on track.
Maybe I am over doing it, but I am a little worried.
posted on 26/7/18
comment by Edinspur (U1109)
posted 16 seconds ago
The amount of money being chucked at it to complete it is ridiculous as well.
With hindsight it probably would have made more sense to knock down the hole of the family stand for the 16/17 season so we could start building it quicker.
----------------------------------------------------------------------
The money chucked at it is a concern but part of me does wonder whether the club has to foot all the bill if the construction company are behind. Perhaps they are paying at least towards some of these costs if thrybah3v committed to a completion date.
posted on 26/7/18
they have*
posted on 26/7/18
I know some and read other people that have worked there that the turnaround on staff is quick because they are working so hard they do a month or so take the money and quit
posted on 26/7/18
comment by Bake 'em away toys (U7303)
posted 1 minute ago
comment by Edinspur (U1109)
posted 16 seconds ago
The amount of money being chucked at it to complete it is ridiculous as well.
With hindsight it probably would have made more sense to knock down the hole of the family stand for the 16/17 season so we could start building it quicker.
----------------------------------------------------------------------
The money chucked at it is a concern but part of me does wonder whether the club has to foot all the bill if the construction company are behind. Perhaps they are paying at least towards some of these costs if thrybah3v committed to a completion date.
----------------------------------------------------------------------
Depends how the contract is I guess. If the subcontractor have taken all the responsibility then we probably won't be as hit financially, however if we decided to build it in-house and a variety of different subbies then we are probs more screeeewed.
posted on 26/7/18
If mace don’t hit the deadlines apparently they get hit with massive financial penalties
posted on 26/7/18
comment by MKspur - Unleash the Grealish (U9129)
posted 33 seconds ago
If mace don’t hit the deadlines apparently they get hit with massive financial penalties
----------------------------------------------------------------------
I work in Procurement and look after statement of works/contracts all the time with 3rd parties. I'm pretty sure they would have had a fixed outcome contract linked to a completion dates of different phases, if these dates are not met then financial penalty clauses are put in place.
posted on 26/7/18
Sonny
posted on 26/7/18
yeah just looking at it you can see in won't be complete but hopefully it will be ready for the match.
Won't look great unveiling an incomplete stadium
posted on 26/7/18
We are still a month away from the first public test event and much can get done in this time when in the final stages.
Anything between now and then is just pure speculation unless officially from club.
A job that is seriously behind schedule is a lot different to the whole thing being seriously behind schedule.
I would hazard a guess that this particular job may have something to do with the skywalk because that appears to be the only thing to me construction wise and high up that does not seem to have progressed.
Not sure it's a critical feature that needs to be completed in the next several weeks but perhaps there is urgency to have it done and dusted by the NFL game.
posted on 26/7/18
Reckon it’ll be ready for the Liverpool game, but certainly not finished. As long as any unfinished building work passed health and safety then it’ll be fine. They can bang out the work relentlessly during international breaks and depending on how the CL and league cup fixtures fall, might get an extended time period there to work on finishing it.
posted on 26/7/18
Apparently the bars are only going to be ready to serve cream soda for the first six months, until all the pumps are sorted out.
posted on 26/7/18
comment by sandy (U20567)
posted 1 minute ago
Apparently the bars are only going to be ready to serve cream soda for the first six months, until all the pumps are sorted out.
----------------------------------------------------------------------
Woohoo
posted on 26/7/18
Link?
posted on 26/7/18
got to be finished to get practical completion and be signed off by local authority
posted on 26/7/18
posted on 26/7/18
It will be ready by Liverpool
The test events I’m not so sure
posted on 26/7/18
comment by Dave&Danny (U4428)
posted 1 minute ago
got to be finished to get practical completion and be signed off by local authority
----------------------------------------------------------------------
That would be structural and health and safety signs etc a skirting board that needs a second will be fine 😀
posted on 26/7/18
Lardy dardy we likes to party we dont cause trouble and we dont bother nobody.
posted on 26/7/18
Second coat ^